The Construction Traffic Advisories Table is a composite list of lane closures on the island of Oahu. Advisories are listed by project.

Project IDs

 

AIEA/PEARL CITY

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
R016 Localized Rehabilitation of Streets - Phase 4 Roadway reconstruction/
resurfacing
Beginning July 6, 2009 - work between 8:30 a.m. - 3:30 pm for the following streets: Hugh St. (A Road - 3rd St), 3rd St (Hugh St. - Lehua Ave), Puu Kala St (Puu Momi - Puu Poni), Puu Alani Way (Puu Poni St.-makai to Puu Poni St.-mauka), Puu Kula Dr (Puu Poni St - Puu Ulaula St), Puu Ulaula St (Puu Kula St-makai - Hoomalu St), Puu Hina Pl (Puu Ulaula St - end), Puu Poni St. (Hoomalu St - Kamehameha Hwy), Kauhihau Pl (Kuleana Road - end), Kaulike Dr (Kuleana Rd-ewa to Kuleana Rd-koko head), Kuleana Rd. (Kaulike Dr-koko head to Kaulike Dr.-ewa) Kuahao Pl (end to Kaahumanu St), Oihana Pl (Kaahumanu St. - end) One lane of traffic will be open.

 

 

CENTRAL HONOLULU

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
H036 Kinau Street Off-Ramp Off-Ramp Widening Single left-lane closure, weekdays, 8:30 am to 3:00 pm  
H040 Ala Moana Blvd., Atkinson Drive to Piikoi St. Sewer Reconstruction Two left lanes will be closed in the westbound direction as follows: 10:00 pm Saturday night to 10:00 am Sunday morning; 8:00 pm, Sunday night to 6:00 am Monday morning; and 9:30 pm to 6:00 am Monday nights through Friday mornings.  
R001 Rehabilitation of Various Streets on Oahu-FY2007 Street repaving. Curb and gutter work along various streets in Kahala. Work on Pacific Heights, Haleiwa, Kapahulu and Kaneohe as part of IDIQ #1 is on hold until the new Master Agreement schedule of values has been approved. Work is being scheduled for Pacific Heights Drive beginning in May, 2010.
R003 Reconstruction of Lusitana Street Major street pavement reconstruction - Work is between Pauoa Avenue and Iolani Avenue Road work has restarted. Work is on-going between 8:30 a.m. to 3:30 p.m. with intermittent lane closures.  
R006 Rehabilitation of Streets, Unit 50 Pavement reconstruction/
resurfacing
Intermittent lane closures on Kalawao Place (Kalawao St. to end), Kalawao St. (Kahaloa Dr. to Private road), Kalehua St. (Kahaloa Dr. to end), Kaloaluiki St. (Lowrey Ave. to Kalawao St.) Kanu St. (Lowery Ave. to Loi St), Loi St. (E. Manoa Rd. to Woodlawn Dr), Kahawai St. (Lowrey Ave. to Huapala St), Woodlawn Dr. (Lowrey Ave to Kahaloa St), Lowrey Ave. (Woodlawn Dr. to Kalawao St) Kaaipu Ave. (Oahu Ave. to end), Loomis St. (makua End to Makai end), Hiehie St. (Kaloaluiki St. to end) and Vista Place (Lowrey Ave to end) from 8:30am to 3:30am Mon. to Fri. WORK HAS BEEN TEMPORARILY SUSPENDED.
R020 Local Rehabilitation of Streets, Phase 1 Repaving work on local streets Metcalf Street in Manoa between Wilder and University Avenue - between 8:30 a.m. - 3:30 p.m. M - F. Work on Halawa Valley Road is being done at night between 7:00 p.m. - 3:30 a.m., M-F. One lane of traffic is available at all times. Work on Woodlawn Drive between Lowrey to the end of Woodlawn Drive is expected to begin on April 21, 2010.
S001 Beretania Street - 1617 Sewer Rehabilitation, McCully Trenching for replacement of sewer line Intermittent lane closures on Beretania Street between Punahou Street to 1703 Beretania Street 8:30am to 3:30pm Mon. to Fri.  
S004 Kalihi Valley Reconstructed Sewer, Area 1 to 4 Rehabilitate 19,503 feet of 6 to 18 inch sewer pipes and 13 laterals Work is on-going on various streets. Work is from 8:30 a.m. to 3:30 p.m. M - F. One lane to be opened to thru-traffic at all times. The majority of the work is trenchless excavation. Contractor has started probing along Jennie Street.
S005 Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1E Structural and hydraulic rehabilitation of existing deficient gravity sewer Electrical work is on-going on Vineyard Blvd. No lane closures are expected. Work hours: 8:30 a.m. - 3:30 p.m., M - F. One lane of traffic to be opened at all times Work on Vineyard (HECO steel plate installed) is complete. Website: honoluluroadwork.com
S006 Kalihi/Nuuanu Area Sewer Rehabilitation, Phase 1G Structural and hydraulic rehabilitation of existing deficient gravity sewer Intermitent lane closure along Kuakini Street Sewerline on Hialoa Street is complete. Roadway repaving to follow. Kauila Street work is on-going. Website: honoluluroadwork.com
S015 University Avenue 1918 Sewer Rehabilitation Manoa Replacement of existing sewer Project has not started.  
S016 Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion Reline existing sewer Intermittent lane closures on Piikoi St (1164 Piikoi St to Pensacola St), Prospect St. (Pensacola St. to Thurston Ave), Wilder Ave (Pensacola St. to Thurston Ave), Kamamalu Ave (Iolani Ave to San Antonio), Hualii St (Kamamalu St. to Lusitana St), Avon Way (Spencer St to end), Victoria St. (Lunalilo St. to Green St), Emerson St. (Lunalilo St. to Green St), Alapai St (Magellan Ave to Prospect St), Iolani Ave (Frear St to Lusitana St), Prospect St. (Alapai St. to Miller St), 2220 - 2146 Kamehameha Hwy, Factory St (N. King St to Waterhouse), Kopke St. (Waterhouse to Stanley St), Gulick Ave (Waterhouse to Stanley St), Puuhale Rd. (Kahanu St. to Kaumaulii St), Bannister St (N. King St to 708 Bannister St), N. King St (Kopke St. to Kalii St), Kopke St. (Hanu Ln. to N. King St), Lanu Lane (Kopke St to end), Pulaa Ln. (N. King St to end), Huene St (Maui St to Wyllie St), Puunui Ave (Kauai St. to Hawaii St), Pahukui St (Nakuina St. to Gulick Ave), Kealoha St (Nakuina St. to Gulick ave),Uhu St. (Gulick Ave to end), 1048 Kamehameha IV Road to Coombs Ln., 1231 Gulick Ave to Kealoha St., 1032 Horner St to Middle St, 1214 - 1220 Kamehameha IV Rd, 1021 Middle St. to Kahauiki St, Kalihi St (Day Pl. to Beckley St), 1132-1146 Pinkham St., Hani Ln (Kalii St to Pulaa Ln), Leilani St (Fernandez St. to Lakapu St.), Fernandez St. (Adelaide St. to Leilani St), N. School St (Likelike Hwy to Haupu Pl), Adelaide St. (Fernandez St to Lakapu St), 1534 Gulick St. to N. School St., Waikoae Rd. (Amelia St to Martin St), 1667 - 1702 Lima St., Bulick Avenue (Ulana St. to Ano Ln) from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. Website: honoluluroadwork.com
S017 Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion Reline existing sewer Intermittent lane closures on Meyer St. (Notley St. to 1530 Meyers St), 2354 Pio Pl. to Kamehameha IV Road, 1506 Kamehameha IV Road to Pio Place, 1556 Kamehameha IV Road to N. School St., 811-905 Umi St, 1801 - 1820 Ahuula St, 924 Self Lane to Akina St., 1734-1826 Eluwena St, 2112-2138 Mahalo St, 633-656 N. Judd St., 2042 - 2009 Nu Pl, Keola St (Kealakai St to Lanakila Ave), Lanakila Ave (N. Kuakini St to Simon Rd), Luka St. (Lanankila Ave. to Kealakai St), 1110 Hala Dr. to Kalepa Pl, Hala Drive (Laki Rd to Lolena St), Kealakai St. (Laki Rd. to Luka St), 2069 Iholena St. to N. Judd St, 818 Iholena Pl. to Iholena St from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. Website: honoluluroadwork.com
S019 Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion Reline existing sewer Intermittent lane closures on 1843 - 1925 Pacific Heights, Punchal St. (Pali Hwy to Pali/Pauoa Rd), Nuuanu Ave (S. Kuakini St to Muliwai Lane), 27 Kauila St to Nuuanu Avenue, 1629 Nuuanu Avenue to Kauila St., 36 - 50 Bates, 20 Muliwai Lane to Nuuanu Avenue, 1817 - 1829 Lusitana St, 1817 Puowaina Dr to Kamamalu Avenue, 135 to 111 boyd Lane, 1819 Pacific Heights to S. Kuakini St, 214- 244 San Antonia Ave, 215 Puuhue Pl. to 1641 Stillman, Frog Lane (Puuhue Pl. to N. School St.) 1616 Stillman Lane to N. School St. from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. Website: honoluluroadwork.com
S020 Houghtailing Street Area Sewer, Area 1 and 2 Rehabilitate existing sewer Intermittent lane closures on Houghtailing Street. from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. NTP issued on January 13, 2009
S021 Wilhelmina Rise Sewer Rehabilitation Work on existing sewer line Intermittent lane closures on Keanu St (wilhelmina Rise to 13th Ave), Wilhelmina Rise (Keanue St to Pukalani Pl), Wilhelmina Rise (Sierra Dr. to Sierra Dr), Sierra Dr (Nihipale Place to Halehoola Pl), Halehoola Pl. (Sierra Dr to end), Anuhea Place (Anuhea St. to end), Puumalu Place (Paula Dr. to end) Paloma Pl. (Paula Dr to end), Pili Place (Paula Dr to end), Carnation Place (Iwi Way to end), Iwi Way (Niele Pl. to Paula Dr), Pioi Pl(Niele Pl. to end), Lurline Dr. ( Monterey Dr to Matsonia Dr), Lanipoki Pl. (Lurline Dr. to end) and Lurline Dr. near Sierra Drive from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. Contractor has begun CCTV and cleaning of sewer lines.
S022 Wanaao Road/Keolu Drive Reconstructed Sewer Rehabilitation existing sewer Intermittent lane closures on Keolu Dr (Nanialii St. to Wanaao Rd) and Wanaao Rd. (Keolu Dr. to Auwinala Rd) from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. Micro tunnelling shafts along Keolu Drive continues. A slipline repair has been agreed upon and Coluccio has been given the NTP to start work.
S023 St. Louis Heights Sewer Rehabilitation Rehabilitate existing sewer Intermittent lane closures on St. Louis Dr (Dole St. to Bertram St), Dole St. (St. Louis Dr. to Frank St.), Frank St. (Dole St. to Eugene Pl), Eugene Pl. (Frank St. to end), Alphonse Place (Frank St. to end), Robert Place (Frank St. to end), Kaminaka Dr. (St. Louis Dr. to Kanalui St), Kalaepohaku (Kaminaka Dr. to Akeakamai St), Pule Place (Kalaepohaku to end), Kalaepohaku to end, Kanalui St. (Kaminaka Dr. to end), Akeakamai St. (Kaminaka Dr. to end), Alencastre St. (St. Louis Dr. to St. Louis Dr), Felix Street (Alencastre St. to St. Louis Dr), Gulston St. (Alencastre St. to St. Louis Dr), Herman St. (Alencastre St. to St. Louis Drive), Libeert St. (Alencastre St. to St. Louis Dr), Maigret St. (Alencastre St. to end), Alencastre Place (Alencastre St. to end), Bertram St. (St. Louis Dr. to Peter St), Noah St. (St. Louis Dr. to St. Louis Dr), Oswald St. (St. Louis Dr. to St. Louis Dr), Peter St. (St. Louis Dr. to end), Quincy Place (Peter St. to end), Ruth Place (Peter St. to end) from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened.
S026 Kalihi/Nuuanu Area Sewer Rehabilitation Sewer line rehabilitation Intermittent lane closures between N. Judd Street to 1069 Iholena Street from 8:30am to 3:30pm Mon. to Fri. Website: honoluluroadwork.com
S031 Puolo Drive 1085 Sewer Rehabilitation Sewer line rehabilitation Intermittent lane closures on 1079 Puolo Drive to Ukama Street from 8:30am to 3:30pm Mon. to Fri.  
S033 Kalihi/Nuuanu Area Sewer Rehabilitation Phase1C Rehabilitation of existing sewer Construction is ongoing on Kalama, Kanoelani and Laniuma Road. One lane of traffic in each direction is available. Work is from 8:30 a.m. to 3:30 p.m., M-F Website: honoluluroadwork.com
S034 Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1D Rehabilitation of existing sewer Intermittant lane closures from 8:30 am to 3:30 pm M-F on Lanakila Avenue and School Street, Alaneo Street from School St. to Kuakini St., Lolena St. from Kealakai St. to Iholena St., Pacific Heights Road from 2455B to 2455C, Captain Cook Avenue and Alapai Street, Wilder Avenue from Piikoi Street to Makiki Apts. Website: honoluluroadwork.com
S035 Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1A Rehabilitation of existing sewer Intermittant lane closures from 8:30 am to 3:30 pm M-F on Puuhale Rd. from Kalani Street to Dillingham Blvd., Mokauea St. from Kalani St. to Dillingham Blvd., Hau Street from Puuhale Rd. to Kalihi St., Colburn St. from Puuhale Rd. to Kalihi St., Dillingham Blvd from Puuhale rd. to Mokauea St., Eluwene St. from Puuhale Rd. to Kalihi St., Kaumaualii St. from Puuhale Rd. to Kalihi St., Ahuula Street from Puuhale Rd. to Mokauea Street. Website: honoluluroadwork.com
S036 Houghtailing Street Sewer Repair Rehabilitation of existing sewer Intermittent lane closures from 8:30am to 3:30pm M-F in the Kamehameha Heights area on various streets within the area bordered by North School Street, Kokea Street, Kamalii Street, Aulii Street, Ilima Drive, Makanani Drive, and Kapalama Drive.  
W008 Kalihi WSI Part I Installing water mains Lane closures on Kamehameha IV Rd below School St. between 7:30am to 3:30 pm. Mon-Fri  
W011 Pacific Heights Water System Improvements, Part 1 Installing new water mains No closures scheduled.  
W014 Kapahulu Water System Improvements, Part III Trenching for waterline replacement Contractor working on Kanaina St. and side streets between Campbell Ave. and Leahi Ave. also from Kapahulu Ave. and Kaunaoa St. No road closures  

 

 

CENTRAL OAHU

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
H018 H-2 Fwy., Pearl City to Schofield Barracks Pavement marking installations Multiple lane closures in both directions between the H-1/H-2 split near Pearl City and the H-2 Fwy. Terminus near Schofield Barracks on Sunday night to Friday monrning, from 9:00 pm to 4:00 am nightly.  
H050 H-2 Fwy., Waipio to Mililani Expansion Joint Repairs Three left lanes will be closed in the northbound direction between Ka Uka Blvd. Overpass and the Mililani Mauka Off-Ramp (Exit 5A) from 9:00 pm on Wednesday night to 4:00 am on Thursday morning.  
R017 Localized Rehabilitation of Streets - Phase 3 Roadway reconstruction/
resurfacing
Beginning July 6, 2009 - work between 8:30 a.m.m - 3:30 pm for the following streets: Mamalahoa Pl (Old Pali Rd - end), Niniko Pl (Old Pali Road - end), Gartley Pl (Old Pali Rd - end), Old Pali Place (Old Pali Rd. - end), Paris Pl. (Old Pali Rd to end), Palimalu Dr. (Old Pali Rd. to end), Hakumele Pl (Nuuanu Pali Dr.. to end), Poli Hiwa Pl (Nuuanu Pali Dr to end), Kimo Dri (Nuuanu Pali Dr - Kaohinani Dr), Olaa Pl (kahawalu Dr to end), Kahawalau Dr (Kimo Dr - Kaohinani Dr), Kaohinani Drive (Kimo Dr. - Kahawalu Dr) One lane of traffic will be open however lane closureswill be required for the narrow streets for cold planing work.

 

 

EAST HONOLULU

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
H033 Kalanianaole Hwy. between Hawaii Kai Golf Course and Sea Life Park, both directions Retaining Wall Improvements Full night road closures in both directions, 9:30 pm to 5:30 am, weeknights Use alternate routes
H039 Kalanianaole Hwy, Hawaii Kai Drainage Protection and Erosion Control Possible right lane and/or bike lane closure in the westbound direction from Keahole St. to Hawaii Kai Drive, weekdays, 8:30 am to 3:00 pm.  
R001 Rehabilitation of Various Streets on Oahu-FY2007 Street repaving. Curb and gutter work along various streets in Kahala. Work on Pacific Heights, Haleiwa, Kapahulu and Kaneohe as part of IDIQ #1 is on hold until the new Master Agreement schedule of values has been approved. Work is being scheduled for Pacific Heights Drive beginning in May, 2010.
R004 Rehabilitation of Street, Unit 38 Pavement reconstruction/
resurfacing
Work is substantially complete. Intermittant lane closures between 8:30am to 3:30pm to complete punchlist items and final inspection work. One lane of traffic to be opened in each direction during construction.
R023 Rehabilitation of Streets, Unit 62 Pavement reconstruction/
resurfacing
Ala Wai Boulevard (Kanekapolei Street to Kalakaua Avenue) Work will be performed between 8:30 a.m. to 3:30 p.m.  
S025 Kahala Avenue Sewer Structural Rehabilitation Sewer line rehabilitation Project has not started.  
W003 Job 08-004 Wilhelmina Rise Water System Improvements, Part III install new water main Intermittent lane closures on Wilhelmina Rise between Anuhea St. and Sierra Dr. at Maunalani Park. 8:30am to 3:30pm M-F for sidewalk repair and restriping of lane markings.  

 

 

EWA

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
H010 Fort Weaver Road Road Widening Single lane closures in both directions on Fort Weaver Rd. between Hanakahi St. and Popoi Place, weekdays, for pavement marking work, 8:30 am to 3:00 pm

 

 

H030 H-1 Freeway NewKapolei Interchange Complex Major highway reconstruction Continuous 24-hour closure of Off Ramp (Exit 1B) to Makakilo, Kapolei and Kalaeloa until the end of 2010. Use Exit 1A to Campbell Industrial Park and Kapolei Parkway to access Kapolei town.
H041 H-1 Freeway, Makakilo to Kapolei Dowel Retrofit Work Two right lanes closed in the eastbound direction from the Makakilo IC to Kualalai Parkway, Sunday night to Friday morning, 8:00 pm to 4:00 am, nightly.  
H043 Farrington Hwy., Waipahu Soil Sampling Work Nighttime left lane and intersection closures on Farrington Hwy. in both directions between Paiwa St. and Mokuola St., Sunday night through Friday morning, in the westbound direction, 7:00 pm to 6:00 am, and, in the eastbound direction, 6:00 pm to 5:00 am nightly. Nighttime left lane and intersection closures on Farrington Hwy. in both directions between Kahualii St. and Aniani Pl., Sunday night through Friday morning, 6:00 pm to 6:00 am. Daytime shoulder lane and intersection closures on Farrington Hwy. in both direction, Kahualii St. and Paiwa St., near Waipahu HS, Monday through Friday, 7:00 am to 4:00 pm daily.  
H044 Farrington Hwy., Looklina to Nanakuli Water Main Installations Right lane closed on Farrington Hwy. in the westbound direction between Kahe Power Plant and Piliokahi Ave., Monday night through Friday morning, 7:00 pm to 3:30 am nightly. Two lanes will be closed on Farrington Hwy. in the eastbound direction between Piliokahi Ave. and Laumanua Ave., Monday through Friday, 8:30 am to 3:30 pm, daily. Traffic will be shifted to use the emergency bypass bridge during the lane closures.  
P010 Street Improvements for Costco Kapolei Roadway Improvements Intermitant lane closures and detoured lanes on Kapolei Parkway from Kamokila Blvd to Kalaeloa Blvd throughout the week and weekend  
S013 Renton Road Sewer and Manhole Rehabilitation Replacement/
repair  of 11,670 feet and 52 sewer manholes
Intermittent lane closures on Renton Road at various locations from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. Contractor is lining sewer line crossing Kalaeloa Blvd.

 

 

LEEWARD

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
R010 Rehabilitation of Secondary Streets by Contract - FY 09 Group 2 Roadway reconstruction/
resurfacing
Intermittant lane closures on Halona Rd (Lualualei Homestead Rd to Puhawai Rd) and Lualualei Homestead Rd (Hale Ekahi Dr. to end) 8:30am to 3:30pm Mon. to Fri. One lane of thru traffic will be available at all times
R019 Emergency repairs to Waipahu St. arch bridge over Waikele Stream (Bridge No. 961) Bridge Repair Activities Waipahu Street between Awamoi St. and Waipahu Cultural Garden Park and Plantation Village entrance. Roadway closure anticipated. Road Closed. All traffic to be detoured to Farrington Highway
W004 FARRINGTON HIGHWAY PART I, PHASE "A" & "B" 12-INCH AND 24-INCH WATER MAINS 1) install new 24" water main. 2) repave exist. pavement of waterline trench 1) Contractor will be working at night from 7:00 pm to 3:30 am. on Farrington Hwy., near Black Rock Point, in the Waianae bound lanes. Special Duty provided. 2) Lane closures along Farrington Hwy. between Nanakuli Ave. and Black Rock Point (8:30 am to 3:00 pm, Mon.-Fri.), Start 7/12/10

BWS PROJECT INFO PHONE NUMBER: 748-5130.

 

 

NORTH SHORE

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
W013 Kamehameha Highway 8-Inch (Haleiwa) Trenching for waterline replacement Connecting new service laterals to existing water meters.

Intermittent lane closures along Kamehameha Highway from Paalaa Rd to 66-580 Kamehameha Hwy.Monday- Friday from 8:00 p.m. to 6:00 a.m.


 
W015 Kamehameha Highway- Sunset Beach Water System Improvements, Part IV Installation of 16" waterline and appurtenances.

Kamehameha Highway will be closed and contra-flowed from the intersection of Kamehameha Highway and Pupukea Road and along the roadway fronting Shark's Cove. The Contractor will be working on the roadway between the hours of 8:30 A.M. until 3:00 P.M., Monday through Friday excluding State and City Holidays.


Anticpate delays due to lane closure. Expect traffic to be backed up especially coming from the direction of Haleiwa to Pupukea. Contractor is being allowed to work during State "Furlough" days and upcoming City "Furlough" days.

 

 

WEST HONOLULU

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
H035 Kamehameha Hwy., Pearlridge to Waimalu Traffic Signal Improvements and Fence Repairs Lane closures on Kamehameha Hwy., daily, Monday to Friday, 8:30 am to 3:00 pm at the following locations: Alternating single lane closures from Honomanu St. to Kaonohi St. in both directions; single left lane closures from Kaahumanu St. to Puu Momi St. in both directions.  
S027 Waipahu Street/Plantation Village Sewer Reconstruction Sewer line rehabilitation Existing sewerline CCTV'd. Rerouting of sewer line is under consideration based on review of DVD. No lane closure is expected.  
S029 Hanawai Circle Sewer Rehabilitation Sewer line rehabilitation Intermittent lane closures on Farrington Hwy (Waipahu Depot to Hanawai Circle) and Hanawai Circle (Farrington Hwy to end) from 8:30am to 3:30pm Mon. to Fri.  
S030 Kilani Avenue 211/Ilima Street 91 Sewer Rehabilitation, Wahiawa Sewer line rehabilitation Intermittent lane closures on California Avenue to 75 Ilima Street from 8:30am to 3:30pm Mon. to Fri.  
W006 Kalihi WSI Part II Ph.B Adjusting and removing of manholes, Misc. Sidewalk work Intermittent lane closures between Kanakanui St. to King St. and Kalihi St. to Puuhale St. occuring between 8:30am to 3:30pm Mon-Fri  

 

 

WINDWARD

 

Project ID
Project Name
Reason for Lane Closure
Street Location, Limits, and Date & Time of Lane Closure
Additional Comments and Website Address
H051 H-3 Fwy., Kaneohe Traffic Camera Repairs Right lane closure in the Kaneohe-bound direction between the Hospital Rock Tunnels and the Likelike Highway Off-Ramp (Exit 9) on Tuesday, 8:30 am to 12:30 pm.  
R013 Rehabilitation of Streets, Unit 46 Roadway reconstruction/
resurfacing
Kailua Road (Hamakua Bridge to Kuulei Road); and Kuulei Road (Kailua Road to Kainalu Drive) from 8:30 a.m. to 3:30 p.m. Mon. to Fri. One lane of traffic in each direction will be opened.
R020 Local Rehabilitation of Streets, Phase 1 Repaving work on local streets Metcalf Street in Manoa between Wilder and University Avenue - between 8:30 a.m. - 3:30 p.m. M - F. Work on Halawa Valley Road is being done at night between 7:00 p.m. - 3:30 a.m., M-F. One lane of traffic is available at all times. Work on Woodlawn Drive between Lowrey to the end of Woodlawn Drive is expected to begin on April 21, 2010.
R022 Rehabilitation of Streets, Unit 52 Pavement reconstruction/
resurfacing
Keolu Drive (Kalanianaole Highway to Akahai Street), Keolu Drive (Akaakaawa Street to Wanaao Road) Work will be performed between 8:30 a.m. to 3:30 p.m.  
S002 Kailua/Kaneohe Sewer Rehabilitation-Phase 1 Sewer replacement Contractor working on spot repairs and CIPP lining work has commenced along Keolu Drive.  
S003 Kalaheo Avenue, Mokapu Road/Aikahi Loop Sewer Rehabilitation Rehabilitate 3,400 feet of 66-inch diameter pipe and 9 manholes.   Work is on Kalaheo Avenue, Mokapu Road/Aikahi Loop from 8:30 a.m. to 3:30 p.m. M - F. One lane to be opened to thru-traffic at all times. Drivers are asked to use caution where steel plates cover the sewer bypass trenches.Work is proceeding on the diversion chamber.
S018 Kaneohe Bay Drive Trunk Sewer Relocation  Relocation of existing trunk line Intermittent lane closures on 818 Iholena Place to Iholena Street, 44-11 to 44-2 Malukai Place, 44-13 to 44-1 Nohokai Place and 44-6 to 44-2 Hulakai Place. from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened.
S022 Wanaao Road/Keolu Drive Reconstructed Sewer  Rehabilitation existing sewer Intermittent lane closures on Keolu Dr (Nanialii St. to Wanaao Rd) and Wanaao Rd. (Keolu Dr. to Auwinala Rd) from 8:30am to 3:30pm Mon. to Fri. One lane of traffic in each direction will be opened. Micro tunnelling shafts along Keolu Drive continues. A slipline repair has been agreed upon and Coluccio has been given the NTP to start work.
W012 Kamehameha Highway 8-Inch (Kaneohe) Connect services to new water main on Pahia Rd. Contractor working on Pahia Rd Monday- Friday from 8:30 a.m. to 3:30 p.m.  

 

 

 