The Major Construction Project Table is a composite list of major construction projects on the island of Oahu.

|
AIEA/PEARL CITY
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| R016 |
Localized Rehabilitation of Streets - Phase 4 |
Roadway reconstruction/
resurfacing |
|
CENTRAL HONOLULU
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| H036 |
Kinau Street Off-Ramp |
Off-Ramp Widening |
|
| H040 |
Ala Moana Blvd., Atkinson Drive to Piikoi St. |
Sewer Reconstruction |
|
| R001 |
Rehabilitation of Various Streets on Oahu-FY2007 |
Street repaving. Curb and gutter work along various streets in Kahala. |
Another Roadway Improvement project by the City and County of Honolulu |
| R003 |
Reconstruction of Lusitana Street |
Major street pavement reconstruction - Work is between Pauoa Avenue and Iolani Avenue |
Another Roadway Improvement project by the City and County of Honolulu |
| R006 |
Rehabilitation of Streets, Unit 50 |
Pavement reconstruction/
resurfacing |
Another Roadway Improvement project by the City and County of Honolulu |
| R020 |
Local Rehabilitation of Streets, Phase 1 |
Repaving work on local streets |
Various streets in Manoa Valley and Lanikai. Project began on Nov. 2 and will continue until August, 2010. |
| S001 |
Beretania Street - 1617 Sewer Rehabilitation, McCully |
Trenching for replacement of sewer line |
|
| S004 |
Kalihi Valley Reconstructed Sewer, Area 1 to 4 |
Rehabilitate 19,503 feet of 6 to 18 inch sewer pipes and 13 laterals |
Limits include: Mokapu Rd. between Kalaheo Ave. to Aikahi Loop, Aikahi Loop between Mokapu Blvd. to Kailua RVWVTP. Construction is on-going. Construction NTP 6/30/08 with completion by February, 2009 Project Engr - Glenn Okita (x8764) |
| S005 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1E |
Structural and hydraulic rehabilitation of existing deficient gravity sewer |
Limits include: 3101 to 3129 Nihi St, Kua Pohaku Lane (Laelae Way to Holua Way), Laelae Way (2951 Laelae to Kua Pohaku). 1641-1731 Mahani Pl, 2970 - 2952 Papali Place, 3057 - 3048Papali St., Pualani St (1587 Puolani St. to Nihi St), 1560 Moani St. to Nihi St., 1552 Noe St. to Nihi St., 1546 Laulani St to Nihi St., 1552 Pahulu St to Nihi St., Valley View Dr. (Numana Rd. to Likelike Hwy), 2945 Numana Rd. to Valley View Dr.,3148 Kalihi St. to Kuapapa Pl., 1917 Heua Pl. to Kalihi St., 3340 - 3351 Kalihi St, 3601 - 3575 Kalihi St) Construction expected to be completed by August, 2009. Work is 21% complete. Project Engr - Lureen Komoda (x8758) |
| S006 |
Kalihi/Nuuanu Area Sewer Rehabilitation, Phase 1G |
Structural and hydraulic rehabilitation of existing deficient gravity sewer |
Limits include: Malanai Pl (Liliha St. to end), Vineyard Blvd (Liliha St. to River St) School St. to Stillman Lane. Work is lcoated in Lower Kalihi, Pacific Heights, Punchbowl and the Liliha Areas. Awaiting State DOT's right of way approval to continue work. |
| S015 |
University Avenue 1918 Sewer Rehabilitation Manoa |
Replacement of existing sewer |
Renton Road at various locations. Anticipated completion date is February, 2009. Construction PM - Theodore Saito (x8770) |
| S016 |
Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion |
Reline existing sewer |
University Avenue between Sea view Avenue to Vancouver Drive. Construction Mgr - Tina Ono (x8766) |
| S017 |
Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion |
Reline existing sewer |
Streets include: Piikoi St (1164 Piikoi St to Pensacola St), Prospect St. (Pensacola St. to Thurston Ave), Wilder Ave (Pensacola St. to Thurston Ave), Kamamalu Ave (Iolani Ave to San Antonio), Hualii St (Kamamalu St. to Lusitana St), Avon Way (Spencer St to end), victoria St. (Lunalilo St. to Green St), Emerson St. (Lunalilo St. to Green St), Alapai St (Magellan Ave to Prospect St), Iolani Ave (Frear St to Lusitana St), Prospect St. (Alapai St. to Miller St), 2220 - 2146 Kamehameha Hwy, Factory St (N. King St to Waterhouse), Kopke St. (Waterhouse to Stanley St), Gulick Ave (Waterhouse to Stanley St), Puuhale Rd. (Kahanu St. to Kaumaulii St), Bannister St (N. King St to 708 Bannister St), N. King St (Kopke St. to Kalii St), Kopke St. (Hanu Ln. to N. King St), Lanu Lane (Kopke St to end), Pulaa Ln. (N. King St to end), Huene St (Maui St to Wyllie St), Puunui Ave (Kauai St. to Hawaii St), Pahukui St (Nakuina St. to Gulick Ave), Kealoha St (Nakuina St. to Gulick ave),Uhu St. (Gulick Ave to end), 1048 Kamehameha IV Road to Coombs Ln., 1231 Gulick Ave to Kealoha St., 1032 Horner St to Middle St, 1214 - 1220 Kamehameha IV Rd, 1021 Middle St. to Kahauiki St, Kalihi St (Day Pl. to Beckley St), 1132-1146 Pinkham St., Hani Ln (Kalii St to Pulaa Ln), Leilani St (Fernandez St. to Lakapu St.), Fernandez St. (Adelaide St. to Leilani St), N. School St (Likelike Hwy to Haupu Pl), Adelaide St. (Fernandez St to Lakapu St), 1534 Gulick St. to N. School St., Waikoae Rd. (Amelia St to Martin St), 1667 - 1702 Lima St., Bulick Avenue (Ulana St. to Ano Ln). Project is 4% complete. Project Mgr - Stuart Ujimori (x8872) |
| S019 |
Kalihi/Nuuanu Avenue Area Sewer Rehabilitatiion |
Reline existing sewer |
Limits include: 818 Iholena Place to Iholena Street, 44-11 to 44-2 Malukai Place, 44-13 to 44-1 Nohokai Place and 44-6 to 44-2 Hulakai Place.Work is 24% complete. Project Mgr - Sean Omatsu/Ted Saito (x8765) |
| S020 |
Houghtailing Street Area Sewer, Area 1 and 2 |
Rehabilitate existing sewer |
Limits include: 1843 - 1925 Pacific Heights, Punchal St. (Pali Hwy to Pali/Pauoa Rd), Nuuanu Ave (S. Kuakini St to Muliwai Lane), 27 Kauila St to Nuuanu Avenue, 1629 Nuuanu Avenue to Kauila St., 36 - 50 Bates, 20 Muliwai Lane to Nuuanu Avenue, 1817 - 1829 Lusitana St, 1817 Puowaina Dr to Kamamalu Avenue, 135 to 111 boyd Lane, 1819 Pacific Heights to S. Kuakini St, 214- 244 San Antonia Ave, 215 Puuhue Pl. to 1641 Stillman, Frog Lane (Puuhue Pl. to N. School St.) 1616 Stillman Lane to N. School St. Work is 4% complete. Project Mgr - Stuart Ujimori (x8872) |
| S021 |
Wilhelmina Rise Sewer Rehabilitation |
Work on existing sewer line |
Limits inlcude: 15412 Hanai Loop to Kapalama Ave, 2021 -2040 Aupuni Street, 2153 Aupuni St. to 1601 Kealia Dr., 1505 - 1537 Kealia Drive, Aupuni St. (N. School St. to Konia St), 2118 Houghtailing St. to Hillcrest St, 2228 - 2240 Makanani Drive, 2015 Naio St. to Makanani Drive, Aupuni st to 1223 Alani St. and 1116 N. School St. to Aupuni St. Work is 39% complete. Project Mgr - Jon Yamane (x8788) Notice to Proceed is tentatively set for January 13, 2009. |
| S023 |
St. Louis Heights Sewer Rehabilitation |
Rehabilitate existing sewer |
Work began on July 30, 2007. Mirco-tunnelling. DDC working on an amendment to contract. Streets include: Keolu Dr (Nanialii St. to Wanaao Rd) and Wanaao Rd. (Keolu Dr. to Auwinala Rd) Work is 34% complete. Project Mgr - Jon Yamane (x8788) |
| S026 |
Kalihi/Nuuanu Area Sewer Rehabilitation |
Sewer line rehabilitation |
Kahala Ave Betweeen 4767 - 4925 Kahala Avenue Work is 15% complete |
| S031 |
Puolo Drive 1085 Sewer Rehabilitation |
Sewer line rehabilitation |
Kilani Ave/ Illima Street Work is between California Avenue to 75 Ilima Street |
| S033 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase1C |
Rehabilitation of existing sewer |
Puolo Dr from 1079 Puolo Drive to Ukama Street |
| S034 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1D |
Rehabilitation of existing sewer |
Middle Street - H-1 to Kamehameha Hwy, Horner Street - H-1 to Omilo Lane, Kamehameha IV Rd. from Pio Place to School St.,Kanoelani Road from Hiu Street to end, Kalama Road from Hiu St. to End, Laniuma Road from Hiu Street to end, Amelia Street from Waikoae Road to School Street, Waikoae Road from Amelia Street to Martin Street, Dement Street from Lohilani St. to Ula Lane, Ula Lane from Dement Street to end, Gulick Avenue from H-1 to Pahukui Street,Gulick Avenue from School Street to Hiki St., Fernandez Street from Adelaide Street to Kalihi St. and Kalihi Street from Mailu Street to Perry Street. |
| S035 |
Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1A |
Rehabilitation of existing sewer |
Lanakila Avenue and School Street, Alaneo Street from School St. to Kuakini St., Lolena St. from Kealakai St. to Iholena St., Pacific Heights Road from 2455B to 2455C, Captain Cook Avenue and Alapai Street, Wilder Avenue from Piikoi Street to Makiki Apts. |
| S036 |
Houghtailing Street Sewer Repair |
Rehabilitation of existing sewer |
|
| W008 |
Kalihi WSI Part I |
Installing water mains |
Another Water System Improvement Project by the Board of Water Supply |
| W011 |
Pacific Heights Water System Improvements, Part 1 |
Installing new water mains |
|
| W014 |
Kapahulu Water System Improvements, Part III |
Trenching for waterline replacement |
|
CENTRAL OAHU
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| H048 |
H-2 Fwy., Pearl City to Schofield Barracks |
Pavement marking installations |
|
| H050 |
H-2 Fwy., Waipio to Mililani |
Expansion Joint Repairs |
|
| R017 |
Localized Rehabilitation of Streets - Phase 3 |
Roadway reconstruction/
resurfacing |
|
EAST HONOLULU
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| H033 |
Kalanianaole Hwy. between Hawaii Kai Golf Course and Sea Life Park, both directions |
Retaining Wall Improvements |
Full night road closures in both directions, 9:30 pm to 5:30 am, weeknightsUse alternate routes |
| H039 |
Kalanianaole Hwy, Hawaii Kai |
Drainage Protection and Erosion Control |
|
| R001 |
Rehabilitation of Various Streets on Oahu-FY2007 |
Street repaving. Curb and gutter work along various streets in Kahala. |
Work on Pacific Heights, Haleiwa, Kapahulu and Kaneohe as part of IDIQ #1 is on hold until the new Master Agreement schedule of values has been approved.Work is being scheduled for Pacific Heights Drive beginning in May, 2010. |
| R004 |
Rehabilitation of Street, Unit 38 |
Pavement reconstruction/
resurfacing |
Work is substantially complete. Intermittant lane closures between 8:30am to 3:30pm to complete punchlist items and final inspection work.One lane of traffic to be opened in each direction during construction. |
| R023 |
Rehabilitation of Streets, Unit 62 |
Pavement reconstruction/
resurfacing |
Estimated completion in March 2010. Construction Mgr Grant Odo (x8815) |
| S025 |
Kahala Avenue Sewer Structural Rehabilitation |
Sewer line rehabilitation |
Project has not started. |
| W003 |
Job 08-004 Wilhelmina Rise Water System Improvements, Part III |
install new water main |
Intermittent lane closures on Wilhelmina Rise between Anuhea St. and Sierra Dr. at Maunalani Park. 8:30am to 3:30pm M-F. Bulk of work to take place between 1900 block and 1700 block of Wilhelmina Rise with 24 hr parking restriction. (concrete road restoration) |
EWA
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| H010 |
Fort Weaver Road |
Road Widening |
Fort Weaver Road from Laulanui Street to Geiger Rd. |
| H030 |
H-1 Freeway NewKapolei Interchange Complex |
Major highway reconstruction |
|
| H041 |
H-1 Freeway, Makakilo to Kapolei |
Dowel Retrofit Work |
|
| H043 |
Farrington Hwy., Waipahu |
Soil Sampling Work |
|
| H044 |
Farrington Hwy., Looklina to Nanakuli |
Water Main Installations |
|
| P010 |
Street Improvements for Costco Kapolei |
Roadway Improvements |
|
| S013 |
Renton Road Sewer and Manhole Rehabilitation |
Replacement/
repair of 11,670 feet and 52 sewer manholes |
N. King St. between Peperson Lane and Dasha Lane, Pua Lane between Vineyard Blvd. to N. King St. Anticipated completion isJune, 2009 Work is 23% complete. Project Engr - Stuart Ujimori (x8772) |
LEEWARD
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| R010 |
Rehabilitation of Secondary Streets by Contract - FY 09 Group 2 |
Roadway reconstruction/
resurfacing |
University Avenue Retaining Wall at Maile Way. Anticipated completion is February 2009. Construction Mgr - Melvin Young (x8825) |
| R019 |
Emergency repairs to Waipahu St. arch bridge over Waikele Stream (Bridge No. 961) |
Bridge Repair Activities |
Waipahu Street Bridge over Waikele Stream. Construction Manager - Wayne Nakamura (x8813) |
| W004 |
JOB 03-104 FARRINGTON HIGHWAY PART I, PHASE "A" & "B" 12-INCH AND 24-INCH WATER MAINS |
1) install new 24" water main.
2) repave exist. pavement of waterline trench |
1) Contractor will be working at night from 7:00 pm to 3:30 am. on Farrington Hwy., near Black Rock Point, in the Waianae bound lanes. Special Duty provided. 2) Lane closures along Farrington Hwy. between Nanakuli Ave. and Black Rock Point (8:30 am to 3:00 pm, Mon.-Fri.), Start 7/12/10 |
NORTH SHORE
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| W013 |
Kamehameha Highway 8-Inch (Haleiwa) |
Trenching for waterline replacement Connecting new service laterals to existing water meters. |
Another Water System Improvement Project by the Board of Water Supply. Start Construction Sept 2009 end April 2010. |
| W015 |
Kamehameha Highway- Sunset Beach Water System Improvements, Part IV |
Installation of 16" waterline and appurtenances. |
Contractor is currently pressure testing the new 16" PVC pipe waterline and appurtenances installed along Kamehameha Highway from the intersection of Kamehameha Highway and Pupukea Road to the intersection of Kamehameha Highway and Puula Road. The Contractor is also pressure testing the new 8" PVC pipe waterline and appurtenances installed along Pahoe Road and Puula Road. While the Contractor is working on Pahoe Road and Puula Road, Kamehameha Highway is completely open in both directions. Work will continue along Kamehameha Highway from Pupukea Road to Kahuola Road. The project is scheduled for completion in February 2011. |
WEST HONOLULU
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| H035 |
Kamehameha Hwy., Pearlridge to Waimalu |
Traffic Signal Improvements and Fence Repairs |
|
| S027 |
Waipahu Street/Plantation Village Sewer Reconstruction |
Sewer line rehabilitation |
between N. Judd Street to 1069 Iholena Street Work is 70% complete. Project Mgr - Stuart Ujimori (x8772) |
| S029 |
Hanawai Circle Sewer Rehabilitation |
Sewer line rehabilitation |
between Awamoi Street to Plantation Village. Work is 88% complete. Project Mgr - Stuart Ujimori (x8772) |
| S030 |
Kilani Avenue 211/Ilima Street 91 Sewer Rehabilitation, Wahiawa |
Sewer line rehabilitation |
Farrington Hwy (Waipahu Depot to Hanawai Circle) and Hanawai Circle (Farrington Hwy to end) |
| W006 |
Kalihi WSI Part II Ph.B |
Adjusting and removing of manholes, Misc. Sidewalk work |
Anticipated completion date- June 2009. Traffic lane closures to follow progress of pipe installation. |
WINDWARD
Project ID |
Project Name |
Reason for Lane Closure |
Project Limits, Project Summary and Anticipated Dates of Construction |
| H051 |
H-3 Fwy., Kaneohe |
Traffic Camera Repairs |
|
| R013 |
Rehabilitation of Streets, Unit 46 |
Roadway reconstruction/
resurfacing |
Work expected to be completed by December 2009. Construction Mgr Franci Terada (x8784) |
| R020 |
Local Rehabilitation of Streets, Phase 1 |
Repaving work on local streets |
Various streets in Manoa Valley and Lanikai. Project began on Nov. 2 and will continue until August, 2010. |
| R022 |
Rehabilitation of Streets, Unit 52 |
Pavement reconstruction/
resurfacing |
Estimated completion in February 2010. Construction Mgr Franci Terada (x8784) |
| S002 |
Kailua/Kaneohe Sewer Rehabilitation-Phase 1 |
Sewer replacement |
Beretania Street between Punahou Street to 1703 Beretania Street. Project to begin on November, 2008 Project scope includes repair and replacement of sewer lines. Project Engr. - Tina Ono (x8766) |
| S003 |
Kalaheo Avenue, Mokapu Road/Aikahi Loop Sewer Rehabilitation |
Rehabilitate 3,400 feet of 66-inch diameter pipe and 9 manholes. |
Notice to proceed issued on November 3, 2008. Project completion date is November, 2009 Project Engr - Lureen Komoda (x8758) |
| S018 |
Kaneohe Bay Drive Trunk Sewer Relocation |
Relocation of existing trunk line |
Streets include: Meyer St. (Notley St. to 1530 Meyers St), 2354 Pio Pl. to Kamehameha IV Road, 1506 Kamehameha IV Road to Pio Place, 1556 Kamehameha IV Road to N. School St., 811-905 Umi St, 1801 - 1820 Ahuula St, 924 Self Lane to Akina St., 1734-1826 Eluwena St, 2112-2138 Mahalo St, 633-656 N. Judd St., 2042 - 2009 Nu Pl, Keola St (Kealakai St to Lanakila Ave), Lanakila Ave (N. Kuakini St to Simon Rd), Luka St. (Lanankila Ave. to Kealakai St), 1110 Hala Dr. to Kalepa Pl, Hala Drive (Laki Rd to Lolena St), Kealakai St. (Laki Rd. to Luka St), 2069 Iholena St. to N. Judd St, 818 Iholena Pl. to Iholena St Project is 70% complete. Project Mgr - Stuart Ujimori (x8872) |
| S022 |
Wanaao Road/Keolu Drive Reconstructed Sewer |
Rehabilitation existing sewer |
Field office is being set-up on 15th Avenue. Work is limited to locating sewer lines. Street include: Keanu St (wilhelmina Rise to 13th Ave), Wilhelmina Rise (Keanue St to Pukalani Pl), Wilhelmina Rise (Sierra Dr. to Sierra Dr), Sierra Dr (Nihipale Place to Halehoola Pl), Halehoola Pl. (Sierra Dr to end), Anuhea Place (Anuhea St. to end), Puumalu Place (Paula Dr. to end) Paloma Pl. (Paula Dr to end), Pili Place (Paula Dr to end), Carnation Place (Iwi Way to end), Iwi Way (Niele Pl. to Paula Dr), Pioi Pl(Niele Pl. to end), Lurline Dr. ( Monterey Dr to Matsonia Dr), Lanipoki Pl. (Lurline Dr. to end) and Lurline Dr. near Sierra Drive. work is 1% complete. Project Mgr - Sean Omatsu/Ted Saito (x8765). Contractor began CCTV and cleaning on January 12, 2009. |
| W012 |
Kamehameha Highway 8-Inch (Kaneohe) |
Connect services to new water main on Pahia Rd. |
Start Construction Aug 2009 end Sept 2010 |
|
|